News

Greenway Shared Path Upgrade along Hawthorne Canal

Work is about to start on one of the missing links of the Greenway, an important urban corridor connecting Parramatta River at Iron Cove to the Cooks River at Earlwood. This section will link Parramatta Road to Marion Street. The works will include new lights, increasing the shared path width to three metres to improve safety for pedestrians and cyclists, and rest stops for the comfort and enjoyment of users.  

Work will begin in early June and take approximately 10 weeks to complete. The works will be carried out in two stages. Stage 1 is from Marion St to Lords Rd and Stage 2 is from Lords Rd to Parramatta Rd. The path will be closed in these two stages during the construction works. Alternate routes for users are shown in the Detour Plan. Detailed signages of the detour will be posted on site.  Click here for more information.

 

RIDE THE GREENWAY YOUR WAY!

A skater captured his trip along the GreenWay starting from Leichhardt through to Iron Cove then back to Lewisham in Sydney's Inner West. Video created by Bo Yuan and Tim Hans.   GreenWay Map below created by Benjamin Salmon.

GREENWAY MAP

Designed By Energetica

Powered by Joomla